How to track project costs

Tracking a project's costs while the work is under way shows a budget problem while there is still time to act on it. It takes a budget broken into cost lines, a project code on every cost and a regular look at what is still to be spent.

  • By Book Keeping Pros
  • Sources checked 15 Oct 2026
On this page

Key takeaways

  • Break the project budget into cost lines, such as materials, labour, subcontractors and equipment, so actual costs can be compared line by line.
  • Code every bill, timesheet and receipt to the project as it arrives, and keep a list of orders placed but not yet billed.
  • business.gov.au suggests comparing actual income and costs with your budget regularly, so you can see where you are over or under and adjust.
  • Each month, costs to date plus committed costs plus an estimate of what is left to do gives a forecast of the final cost.
  • Record each approved variation as a change to both the budget and the price, so the comparison stays fair.

Set a budget by cost line

business.gov.au's glossary describes a budget as a listing of planned revenue and expenditure for a given period. For a project, the period is the life of the project, and the starting point is the estimate behind your quote or contract price.

Split the cost side into lines you can track separately, such as materials, labour, subcontractors and equipment hire. Note the price agreed with the customer and the stages at which you will bill it. business.gov.au suggests a written quote state when the work will start and finish, and those dates set the timeline you track against.

What costs belong to a project?

A project's direct costs are the ones you can trace to it through a supplier bill, an order or a timesheet. Add a share of overheads if you want the full cost. In practice that means:

  • Materials: everything bought for the project or taken from stock for it, including delivery charges on those materials.
  • Labour: the hours your own staff spend on the project, valued at what each hour costs the business rather than the rate you charge for it.
  • Subcontractors: every bill for work on the project.
  • Equipment and other direct costs: hire charges, skip bins, permits and anything else bought only for this job.
  • Overheads, if you want the full cost: a share of costs such as rent, marketing, utilities and administration, which business.gov.au's glossary describes as the fixed costs of operating a business.

Costs that serve the business as a whole rather than one project, such as the rent or the time spent quoting other work, stay in overheads and reach the project only through its overhead share. Equipment the business buys and keeps, such as a new tool or vehicle, isn't a project cost just because it was bought during one.

Note

If the project builds something the business will keep, such as a fit-out of its own premises, whether its costs are recorded as an asset or as expenses is a question for your accountant.

Give the project a code and use it everywhere

Give the project a code, kept in your bookkeeping system alongside the normal accounts or as a column in your spreadsheet, and use it on:

  • purchase orders and supplier bills
  • timesheets, by project and by day
  • card purchases and receipts
  • subcontractor bills
  • every invoice to the customer.

Where a cost is shared between projects, such as a delivery that served two sites, split it on a stated basis and note the basis on the entry. Check each week for project costs entered without a code, while people still remember where they belong.

Track commitments, not just bills

Bills often arrive well after the decision to spend. If you track only what has been billed, a project can look on budget right up until the last invoices land. Track the remaining commitments on orders and subcontracts. Reduce a commitment as the corresponding cost enters actuals, including through a part bill or an agreed accrual, and close it only when no amount remains committed.

Costs to date plus commitments is what the project has already locked in. Adding an estimate of the work still to do gives a forecast of the final cost.

Handle variations

business.gov.au suggests a written quote include any variations and revisions discussed. During a project, every agreed change should update both sides of the comparison: the budget for the extra cost and the price for the extra charge. Keep a variations register with the date each one was agreed, a description, the change to cost, the change to price and whether it has been invoiced.

Work done without an approved variation is an easy way for costs to drift above budget unnoticed, because it adds cost with no matching price.

Report on the project each month

business.gov.au suggests comparing your actual results with your budget to see where you are over or under, and adjusting your plans if needed. For a project, set the figures out by cost line:

Illustrative example: a monthly cost report for a fit-out project
Cost lineBudget (AUD)Actual to date (AUD)Committed (AUD)Still to do (AUD)Forecast final (AUD)
Materials24,000.0015,200.004,300.005,100.0024,600.00
Labour30,000.0017,800.000.0013,400.0031,200.00
Subcontractors18,000.009,000.009,000.000.0018,000.00
Equipment hire4,000.002,100.00600.00300.003,000.00
Total76,000.0044,100.0013,900.0018,800.0076,800.00

Illustrative example only: these rows show the method and are not sourced data.

Forecast final is actual to date plus committed plus still to do. In this example the project is heading over its budget on materials and labour and under on equipment hire, and overall the forecast is above budget. Labour is the line to look at first, because it has the most work still to do.

The "still to do" column estimates costs not already included in actuals or remaining commitments. Ask whoever is running the work to update it each month, counting each cost once, rather than taking the budget less costs so far, which simply assumes the rest will go to plan.

Keep a cost sheet for each stage

A project cost sheet groups every coded cost by stage, so each part of the work can be checked while the next is under way. Here are the fit-out's costs to date, by stage:

Illustrative example: the fit-out's cost sheet by stage, costs to date
CostStrip-outServices rough-inJoinery, under wayTotal
Staff hours84160112356
Labour at 50.00 an hour (AUD)4,200.008,000.005,600.0017,800.00
Materials (AUD)600.007,400.007,200.0015,200.00
Subcontractors (AUD)0.009,000.000.009,000.00
Equipment hire (AUD)1,200.00600.00300.002,100.00
Direct cost to date (AUD)6,000.0025,000.0013,100.0044,100.00
Overhead share at 18.00 an hour (AUD)1,512.002,880.002,016.006,408.00
Full cost to date (AUD)7,512.0027,880.0015,116.0050,508.00

Illustrative example only: these rows show the method and are not sourced data.

The direct cost row agrees with the actual to date column in the monthly report, which confirms that every coded cost has landed in a stage. The two finished stages can now be checked against what was estimated for them, while the joinery is still going.

Labour is costed at what an hour of staff time costs the business. Before you hire someone, business.gov.au suggests checking the total cost of employing them, including their pay, leave and entitlements. The same total, divided by the hours they actually work, gives an hourly cost, and their hours on other tasks, such as quoting, stay in overheads. The overhead share spreads costs such as rent and administration across projects by staff hours, at a rate worked out from a period's overheads and project hours, as our guide to job costing shows. The direct cost tells you whether the project is within its budget; the full cost tells you whether it pays its share of running the business.

What is a cost overrun, and how do you spot one early?

A cost overrun is a project costing more than its budget. The forecast final column in the monthly report is the main warning, but staff hours give an earlier one, because hours are recorded each day while bills can arrive weeks later. Set the hours used on a stage against how far the work has got:

Illustrative example: staff hours against progress on the fit-out's joinery stage, budgeted at 200 hours for 10 cabinet runs
WeekHours used to dateRuns installedHours budgeted for that progressDifference (hours)
Week 4402400
Week 57636016 over
Week 6112510012 over

Illustrative example only: these rows show the method and are not sourced data.

The gap opened in week 5 and hasn't closed. At the rate so far, about 22.4 hours a run, the 5 runs still to go need about 112 hours, so the stage is heading for 224 hours against its 200. At 50.00 an hour that is 1,200.00 of extra labour, the overrun the monthly report shows on the labour line.

Other early signs to watch for:

  • materials reordered for work the estimate already covered
  • work done that isn't in the quote and has no approved variation
  • order and subcontract values creeping up after the budget was set
  • stages running later than planned, which tends to add staff time and hire costs.

Act on the work still to do: re-plan the method, check the remaining quantities, or raise a variation if the customer has asked for more than the quote covers. Money already spent is gone; tracking matters because it shows the problem while the remaining cost can still change.

Keep billing in step with costs

Compare billing and costs to spot a possible funding gap, then check actual payment timing. Customer deposits and supplier credit can change how much cash the business needs. Put expected customer receipts and payments to suppliers, subcontractors and staff into the cash flow forecast, using payment dates rather than invoice dates.

Your accounting method affects what the books show. business.gov.au explains that under accrual accounting a builder who invoices a completed project records the sale even before being paid, while cash accounting records it when the money arrives. How income on a partly finished project is recorded is a question for your accountant.

Close the project out

  1. Confirm every supplier and subcontractor bill has been received and coded, and that no commitments remain open.
  2. Invoice any approved variations not yet billed.
  3. Compare the final cost with the budget as revised for approved variations, line by line.
  4. Note what caused each large difference, and use it in the next estimate.

For pricing smaller, repeatable jobs from the same records, see our guide to job costing.

Compare the quote with the actual cost

When the project closes, set each cost line's final cost beside the estimate behind the quote, adjusted for approved variations. The fit-out finished like this:

Illustrative example: the fit-out's quoted and final costs
Cost lineQuote estimate (AUD)Approved variations (AUD)Revised budget (AUD)Final cost (AUD)Difference (AUD)
Materials22,500.001,500.0024,000.0024,750.00750.00 over
Labour29,000.001,000.0030,000.0031,720.001,720.00 over
Subcontractors18,000.000.0018,000.0018,000.000.00
Equipment hire4,000.000.004,000.002,900.001,100.00 under
Total73,500.002,500.0076,000.0077,370.001,370.00 over

Illustrative example only: these rows show the method and are not sourced data.

Compare with the revised budget, not the original estimate, so approved variations don't look like overruns: they added 2,500.00 of cost, and the price was raised to cover them. Then find the cause behind each line. Materials ran 750.00 over, so check the supplier bills against the estimate for price rises, extra quantities or waste. Equipment hire came in 1,100.00 under because the scaffold was needed for fewer weeks than planned.

Labour is easier to act on when its difference is split into hours and cost per hour. The budget allowed 600 hours at 50.00; the project used 610 hours at an average of 52.00:

Illustrative example: splitting the fit-out's labour difference
PartWorkingAmount (AUD)
Extra hours10 hours over budget, at the budgeted 50.00 an hour500.00
Higher cost per hour610 hours, each 2.00 more than budgeted1,220.00
Total labour difference31,720.00 less 30,000.001,720.00

Illustrative example only: these rows show the method and are not sourced data.

The hours came back close to budget once the joinery was re-planned, but finishing on time took overtime, which raised the cost per hour. Each part needs its own fix in the next quote: more hours for that kind of work, or a cost per hour that allows for overtime when the timeline is tight. business.gov.au suggests quoting for profit rather than just to win the job, and this comparison is how you find out whether the last quote did.

How do you track project costs in a spreadsheet?

Use one workbook for each project, with a sheet for the budget, one that logs every cost as it is coded, and a summary that totals them. A layout that covers everything above:

  • Budget: each cost line and stage, with the estimate behind the quote and a column for approved variations.
  • Cost log: one row per cost, with the date, the supplier or staff member, the document number, a description, the cost line, the stage and the amount. Staff time goes in as hours, with the cost per hour in its own column.
  • Commitments: orders and subcontracts placed, with the amount still to be billed on each.
  • Variations: the register described earlier, with the change to cost and the change to price.
  • Summary: budget, actual to date, committed, still to do and forecast final for each cost line, all worked out by formulas from the other sheets.

Tie the cost log to the books each month: its bills and receipts should total what is coded to the project in your bookkeeping system, and a gap there means a cost reached one and not the other. Staff time costed at an hourly rate won't match the books, so check it against timesheet hours instead. If your accounting software tracks projects or job codes, the actual costs can come from there, and the spreadsheet only needs to hold what the books don't, such as commitments and estimates of the work still to do.

General information

This guide is general information about how bookkeeping works in Australia. It is not personal advice, so check the sources below, or ask your accountant how it applies to your business. Sources checked 15 October 2026.

Sources

  1. Key financial terms

    business.gov.au, Australian Government. Current at 15 October 2026, released 9 July 2024. Checked 15 October 2026.

    © Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.

  2. Prepare quotes

    business.gov.au, Australian Government. Current at 16 October 2026, released 1 August 2025. Checked 16 October 2026.

    © Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.

  3. Create a budget

    business.gov.au, Australian Government. Current at 16 October 2026, released 14 November 2025. Checked 16 October 2026.

    © Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.

  4. Choose between cash and accrual accounting

    business.gov.au, Australian Government. Current at 15 October 2026, released 13 September 2024. Checked 15 October 2026.

    © Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.

  5. Improve your cash flow

    business.gov.au, Australian Government. Current at 16 October 2026, released 20 May 2025. Checked 16 October 2026.

    © Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.

Related service

Management and cash-flow reports

Monthly reports that show where the business stands.

More about management and cash-flow reports

Related guides

  • How to do job costing

    How to work out what each job costs: tag direct costs to the job, add a share of overheads, compare the total with the price and use the results to quote.

  • How to do a variance analysis

    How to analyse the gap between budget and actual results: calculate each variance, decide which to investigate, separate volume from price and act on the cause.

  • How to do a cash flow forecast

    How to build a cash flow forecast for a small business, month by month: what you need, how to estimate money in and out, and how to keep it current.