How to do job costing
Job costing works out what each job cost to deliver, so you can see which jobs made money and price the next one on real figures. It needs every direct cost tagged to a job as it happens, and a consistent way to share out the costs that can't be.
- By Book Keeping Pros
- Sources checked 16 Oct 2026
On this page
Key takeaways
- Job costing gathers a job's direct costs, such as materials, labour, subcontractors and equipment hire, and adds a share of the business's overheads.
- Whether a cost is direct or an overhead depends on what it relates to, which is a separate question from whether it is fixed or variable.
- An overhead rate, such as a period's overheads divided by the productive labour hours in the same period, spreads indirect costs across jobs consistently.
- Comparing each job's total cost with its price shows what the job earned, and comparing actual costs with the quote shows where future quotes need to change.
- business.gov.au suggests quoting for profit by including all costs and adding a fair margin, and job cost records supply those costs.
What job costing is for
A profit and loss statement shows how the whole business did. Job costing breaks that down to each piece of work. It suits businesses that do distinct jobs for customers, such as trades, repairs, printing, events or custom manufacturing.
business.gov.au says getting prices right starts with knowing what it costs to produce your goods or services, and suggests focusing on your most profitable customers, products or services. One pricing method it describes is to calculate the total cost of making and supplying something, including materials, labour and overheads, and then add a mark-up or margin. Job costing gives you that total cost from your own records rather than a guess.
Sort costs into direct and overhead
A direct cost can be traced to one job: the materials used on it, the hours worked on it, a subcontractor engaged for it, equipment hired for it. An overhead is a cost of running the business that can't be traced to any single job, such as rent, insurance, office wages, phones and accounting software.
Note
Tag every direct cost to a job
- Materials: put the job number on purchase orders and supplier bills, and record materials taken from stock against the job they were used on.
- Labour: record hours by job on every timesheet. Multiply them by an hourly cost for each person that covers their wages and other employment costs, not their charge-out rate.
- Subcontractors and hire: enter each bill against the job it relates to.
- Travel and small purchases: note the job number on each receipt.
Costs that reach the books without a job number aren't counted against any job, which makes jobs look less costly than they were. A weekly check for direct costs with no job against them keeps the figures honest.
Work out an overhead rate
Overheads are shared out using a base that tracks how much of the business's capacity each job uses. Productive labour hours, the hours spent working on jobs, are a common choice. Take the overheads for a period from the profit and loss statement, and divide them by the productive labour hours recorded on timesheets for the same period. The divisor must be more than zero, so use a period long enough to include real work.
| Item | Figure |
|---|---|
| Overheads for the quarter (AUD) | 36,000.00 |
| Productive labour hours for the quarter | 1,200 |
| Overhead rate per productive hour (AUD) | 30.00 |
Illustrative example only: these rows show the method and are not sourced data.
Recalculate the rate each quarter or year, because both overheads and hours change. business.gov.au also describes a pricing method that works out all business costs as an hourly rate. A labour cost per hour plus an overhead rate per hour is one way to build that figure from your books.
Build a job cost sheet
| Item | Detail | Amount (AUD) |
|---|---|---|
| Materials | From supplier bills and stock used | 2,340.00 |
| Labour | 38 hours at 55.00 an hour | 2,090.00 |
| Subcontractor | Electrician's bill | 900.00 |
| Equipment hire | Scissor lift, two days | 260.00 |
| Total direct costs | 5,590.00 | |
| Overhead share | 38 hours at 30.00 an hour | 1,140.00 |
| Total job cost | 6,730.00 | |
| Price charged | Quote plus one approved variation | 8,200.00 |
| Left after all costs | 1,470.00 |
Illustrative example only: these rows show the method and are not sourced data.
The last line is what the job contributed after its direct costs and its share of overheads. A job that covers its direct costs but not its overhead share still helps pay the rent, but it doesn't earn its keep at the current price.
Compare the actual costs with the quote
| Cost | Quoted (AUD) | Actual (AUD) |
|---|---|---|
| Materials | 2,100.00 | 2,340.00 |
| Labour | 1,760.00 | 2,090.00 |
| Subcontractor | 900.00 | 900.00 |
| Equipment hire | 260.00 | 260.00 |
| Total direct costs | 5,020.00 | 5,590.00 |
Illustrative example only: these rows show the method and are not sourced data.
Here the work took more hours than quoted and the materials cost more than estimated. Look for the reason behind each difference: hours underestimated, a price rise from a supplier, or work done outside the quote that should have been a variation. Recording extra work as an agreed variation while the job is under way keeps it from going unpriced.
Use the results
- Update your quoting rates for labour and materials when the same differences keep appearing.
- Group finished jobs by type or by customer to see which kinds of work earn the most after all costs.
- Compare the direct costs on all job cost sheets for a month with the direct cost accounts in the books. A gap can point to costs never tagged to a job, though labour costed at an hourly rate and stock drawn from earlier purchases also cause differences.
- Feed the overhead rate into new quotes, so every price covers a share of running the business.
business.gov.au's quoting advice is to price for profit, counting every cost and adding a fair margin. Job costing is how you find out what all the costs were.
General information
Sources
- Improve your cash flow
business.gov.au, Australian Government. Current at 16 October 2026, released 20 May 2025. Checked 16 October 2026.
© Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.
- Choose a pricing strategy
business.gov.au, Australian Government. Current at 16 October 2026, released 1 October 2026. Checked 16 October 2026.
© Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.
- Prepare quotes
business.gov.au, Australian Government. Current at 16 October 2026, released 1 August 2025. Checked 16 October 2026.
© Commonwealth of Australia 2020, licensed under CC BY 3.0 AU. Licence: CC BY 3.0 AU.
Related service
Management and cash-flow reports
Monthly reports that show where the business stands.
Related guides
How to track project costs
How to track a project's costs while it runs: a budget by cost line, a code on every cost, commitments, variations and a monthly forecast of the final cost.
Bookkeeping for tradies
How to keep a trade business's books: written quotes, a record for each job, receipts from the road, deposits, and invoices that itemise the work.
How to calculate your break-even point
How to find the sales your business needs to cover its costs: sort fixed and variable costs, find each sale's contribution, then calculate in units or sales.